Random Photos

Ordered 80, ended up needing 84. Concrete guys were a bit mad at me when they showed up to a boom pump instead of a line pump. Guess they should have told me which one lol
That’s a good estimated yardage. The boom still works though. A line would be easier some what. And yes, they should have told you, or asked what you ordered.
That’s a nice job .
 
On our commercial buildings, the pours are at like 2 or 3 in the morning so they can get out of the way of other trades and the floors can be cured enough to walk on by mid morning.

Did you intentionally schedule the pour real early or do concrete subs only know how to pour in the middle of the night lol.
I took that picture at 630. lol they started pouring at 7. Honestly I think it’s the concrete trucks that like to go early. Try calling Readymix at 3pm and getting an answer. They are long gone.
 
The rural area we live in does a neighborhood Trick or Treat and everyone that participates sets up in their driveway. We pull the Gladiator down and play spooky music, have a fire pit , and drink cocktails while the neighbors bring their kids by. It’s a good time, kids and adults have a blast.

IMG_7965.jpeg
 
Last edited:
The rural area we live in does a neighborhood Trick or Treat and everyone that participates sets up in their driveway. We pull the Gladiator down and play spooky music, have a fire pit , and drink cocktails while the neighbors bring their kids by. It’s a good time, kids and adults have a blast.

View attachment 415843
That looks like fun. One thing my wife really misses since we moved way out is the trick or treaters.
 
Top Bottom