looks really good, and EVO inspired! :thumb: are you planning on gusseting the base to the tubing for support like EVO does?
Thanks Chris. Yes definitely EVO inspired, with VKS lines, and going with the weld nuts to frame mount though (somewhat LOD) without using the existing bottom of frame threaded holes though. It Will have 32,000 lbs of single shear value on the hardware to frame at each mount though, so we will see. From what I have found, A 3/8 grade 8 bolt has a shear value of around 8500 lbs.
I'm still kicking around ideas for the wife's side so she can get in easier.