CJ buggy build

klungly

Member
I got my transfer case bolted up to my transmission, it was a pain. I had to remove both exhaust pipes and cut a bracket off the frame. I need to make a cross member for the transmission and a mounting bracket for the transfer case. Next will be cutting the tub and frame to get ready to start mocking up the rear axle for control arms and coilovers. IMG_20170101_144212601.jpg IMG_20170101_144203746.jpg IMG_20170101_144138105.jpg IMG_20170101_150225149.jpg IMG_20170101_150213472.jpg

Sent from my XT1585 using WAYALIFE mobile app
 

klungly

Member
Took the gas tank out and removed all the wiring from the back half of the tub. IMG_20170103_162706868.jpg IMG_20170104_163107563.jpg . I taped off the section of tub that I need cut off and made a cut before I had to stop. IMG_20170104_181114665.jpg

Sent from my XT1585 using WAYALIFE mobile app
 
Top Bottom