Productive weekend!

TacticalTortuga

New member
Finally making some progress! Finished wiring up my rubicon axles e-lockers and some new steering linkage. Thanks for the great write ups on here. Only mistake is I forgot to order switches wth horizontal text for the a pillar switch mount I used. Have text illuminate with lights and locker symbol tied to locker indicator on axle. Red for text green for positive engagement.

Also lucked out and somehow hit a large pothole on my way to work... funny how they pop out of nowhere! That was all I needed to convince the wife it was time for new tie rod, drag link and high steer. What a difference it makes. Tightened the steering up and improved body roll on the windy roads. Last step is to weld up the track bar bracket. IMG_1478985610.137812.jpg IMG_1478985626.605401.jpg


Sent from my iPhone using WAYALIFE mobile app
 
Last edited:
Top Bottom