Psc pump installed along with reservoir and orbital. Still need to plumb it all together.
Yesterday we got rear axel in. That only took us about 6 hours. Every CA fought us going in. Neither me nor Matt had experienced this marathon axel install before. Irritating as hell barely describes it. Fortunately after the rear was that difficult the front axel decided to olay nice and went in much easier. Ended the day with measurements for drive shafts. Pretty sure we got that order in right at the end of the day for Adam's also.
Need to fab sliders and get those painted.
Oh, my aluminum radiator that was installed about 6 months ago decided to start leaking as it couldn't handle the lack of use i guess. So now that needs replaced also. Not even gonna warranty it. We know 2 guys who went with the same model and there's leaks also. Illtake the loss and get another brand.
Back at the shop in an hour or so to see what else we can check of the assembly list today.
Oh yeah I got axels sent out and returned last week with the 4:88 gears installed.