Putting my zone 3 inch kit and coast front shaft on this weekend finally!!
I'm mechanically inclined anyone have a good time estimate to do the install since I'm doing it Saturday but need to get to work Sunday lol
Depending on what all comes with your kit, you should be able to get the lift on in a day. With the right tools and know how, you can easily do each side in about 4 hours and less if you don't have adjustable control arms to deal with. Drive shaft takes about 2 hours.
Oh yea I forgot to mention I do have adjustable front control arms
You can set them up ahead of time and it'll help speed things up but, you should still tack on at least an hour more or so and more if you are doing uppers too. Also, you may want to account for even more time to dial in your caster after everything is installed.
Depending on what all comes with your kit, you should be able to get the lift on in a day. With the right tools and know how, you can easily do each side in about 4 hours and less if you don't have adjustable control arms to deal with. Drive shaft takes about 2 hours.
Eddie why 2 hours for the shaft ?? It seemed pretty easy change the yokes and bolt it in ?
It can be done in less time for sure, I was just being generous just in case this is your first time. It is near impossible to remove the factory shaft without removing the skid and it's a pain in the ass to remove all the tiny bolts securing it to the flange. That typically takes the most time.